Major Mines Projects | Lindi Jumbo Project
Fresh ore and waste will be drilled and blasted before being loaded and hauled in a similar manner. In order to achieve a highgradefeed to the mill, three discrete ore streams are mined, a lowgrade stream (0% to 10% TGC material), a medium grade stream (10% to 20% TGC material) and a high grade stream (+20% TGC ore).